درحال مشاهده: مهندسی و مدیریت ساخت پروژه - Adaptation


ادعونی
اهدای خون
موسسه محک
اهداء عضو

Adaptation

1395/05/30
19:52
امیرحسین ستوده بیدختی امیرحسین ستوده بیدختی
So, we talked about predictive systems. When we cannot use a predictive system, an adaptive one is a great replacement. Adaptive systems are those commonly called “Agile”.

This system is used when we have a result in mind, but we cannot be sure what kind of product can create it, and therefore “prediction” is not possible. This is the case when the market changes dramatically (think of IT), or it’s not possible to really understand the market or the client. 

In this case, we will have a number of cycles. In each cycle, a subset of the product is designed, planned, built, tested, and made ready for deployment. We provide it to the customer or end user and receive feedback. We’ll “adapt” based on the feedback; we understand what should be the output of the next cycle.
The cycles are run, until enough value is created in the latest product and we’re close enough to the expected result. This is adaptation; this is Agility.
انجمن مهندسی و مدیریت ساخت ایران (ICEMA) Iran Construction Engineering Management Association
Agile is usually called modern, compared to predictive methods that are called “traditional”. What’s your opinion about it?


برچسب ها:Adaptation ،
نظرات

ادامه مطلب ادامه مطلب

مهندسی و مدیریت ساخت پروژه - Adaptation

مهندسی و مدیریت ساخت پروژه - Adaptation,مدیریت ساخت ,مدیریت پروژه, مدیریت پروژه های ساخت, مدیریت پروژه و ساخت,مدل سازی اطلاعات ساختمان,مدیریت ساخت
تمامی حقوق این وب سایت متعلق به مهندسی و مدیریت ساخت پروژه است. |طراحی و توسعه:امیرحسین ستوده بیدختی|
شبکه اجتماعی فارسی کلوب | Buy Website Traffic | Buy Targeted Website Traffic